Fees as a path statistic
The fee is a rate on displacement
Charge a percentage of the quote leg. By I2 the quote leg is linear in , so
with measured per unit of exposure. The pool's fee state is a geometric property of the price path — times its total variation — with no price-weighted Jacobian to reconcile.
A base-side fee does not take this form: it carries a weight, so the accumulator would no longer be and one scalar would not serve every position. That is why fees here are quote-only, and it is a consequence rather than a convention.
is also the yield
Because is per unit , and is the base-leg value in quote, is directly a cumulative return on base exposure — no normalisation:
So over a window is cumulative fee return on active liquidity. Reporting an APR requires annualizing by the window duration. For an active uncapped position, dividing by its starting converts it to return on starting capital — the same that appears as leverage. One global scalar answers "what is this pool yielding" for every LP at once. A price-weighted accumulator would not survive this.
The edge
Track the quadratic variation alongside . Realized LVR per unit is exactly on the path that happened — the same with realized variance in place of an assumed one. Hence
Two accumulated numbers and a subtraction. No volatility model, no benchmark portfolio, no oracle. They are commensurable because both are path statistics of the same .
Simulation check. , year, s, 40 paths: against , theory , with per-path edge within .
Calibration: the matched gain
Set and equate expected income with the bill. Per block, fee income is and the LVR bill is . For Gaussian log-returns , so
is linear in — that is the central calibration fact. LVR is linear in variance while fee revenue is linear in volatility, so a single static under-compensates LPs in volatile regimes and over-charges traders in quiet ones. The two errors point in opposite directions and no static value fixes both.
Worked example. per year, s yr: bp per swap.
At the edge is zero in expectation by construction, so the sign of the realized reports directly whether the kernel over- or under-charged on the path that happened. The current contracts charge fixed swap fees. Fee machinery separates that implementation from the earlier dynamic estimator.
Fees translate the floor
A quote injection at fixed cannot leave the position unchanged. Since , it is a floor translation:
Check: . ✓
Compounding is therefore a relabelling rather than a trade — there is no ratio to rebalance into, and no swap is needed. Quote-only fees are precisely what makes the identity work; base-asset fees would require a market swap back to quote first.
Two things follow, one for each pool:
- In the F-pool this identity is the entire fee mechanism: every share has the same floor, so moving it credits everyone at once and nothing is stored.
- In the C-pool it is the same additive shift for every active position, independent of and , so ladder spacing and ordering are preserved by compounding.
The dual direction is also available: withdrawing of quote raises the floor by , bounded by — drainable to the current price, not beyond.